Cost Estimation
Civil & Structural Works
Beams
| Name | Height (mm) | Width (mm) | Surface Area (m²) | Span (m) | Number | Volume (m³) | Concrete Unit Cost (Ksh/m³) | Steel Quantity (kg) | Steel Unit Cost (Ksh/kg) | Steel Links Qty (kg) | Steel Links Cost (Ksh) | Binding Wire Cost (Ksh) | Formwork Area (m²) | Formwork Unit Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Columns
| Name | Width (mm) | Depth (mm) | Area (m²) | Height (mm) | Number | Volume (m³) | Concrete Unit Cost (Ksh/m³) | Steel Quantity (kg) | Steel Unit Cost (Ksh/kg) | Steel Links Qty (kg) | Steel Links Cost (Ksh) | Binding Wire Qty (kg) | Binding Wire Cost (Ksh) | Formwork Area (m²) | Formwork Unit Cost (Ksh/m²) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Column Bases
| Name | Number | Length (mm) | Width (mm) | Thickness (mm) | Volume (m³) | Concrete Unit Cost (Ksh/m³) | Steel Qty (kg) | Steel Fab Cost (Ksh) | Steel Labor (Ksh) | Steel Overheads (Ksh) | Steel Unit Cost (Ksh/kg) | Binding Wire (Ksh) | Formwork Area (mm²) | Formwork Unit Cost (Ksh/m²) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Walls
| Name | Cost per Brick (Ksh) | Wall Length (m) | Wall Height (m) | Brick Length (mm) | Brick Height (mm) | Total Bricks | Brick Cost (Ksh) | Plastering Mortar Vol (m³) | Joint Mortar Vol (m³) | Mortar Volume (m³) | Mortar Cost per m³ (Ksh) | Total Mortar Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Foundations
| Foundation Type | Footing Thickness (mm) | Volume (m³) | Concrete Cost (Ksh) | Diameter of Footing Bars (mm) | Bottom Bars Length (m) | Top Bars Length (m) | Total Bars Length (m) | Reinforcement Weight (kg) | Total Bar Cost (Ksh) | Length of Foundation Wall (mm) | Width (mm) | Height (mm) | Cost of Bricks per Piece (Ksh) | Total Bricks | Brick Cost (Ksh) | Mortar Volume (m³) | Mortar Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Excavation
| Type | Length (mm) | Width (mm) | Depth (mm) | Total Excavation Volume (m³) | Excavation Cost per m³ (Ksh) | Row Cost (Ksh) |
|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Roof Works
| Roof Shape | Roof Material | House Length (mm) | House Width (mm) | Crosstie Length (mm) | Kingpost Height (mm) | Truss Cost per m (Ksh) | Total Truss Length (m) | Total Truss Cost (Ksh) | Purlin Spacing (mm) | Purlin Cost per m (Ksh) | Purlin Cost (Ksh) | Roofing Area Right (m²) | Roofing Area Left (m²) | Total Roof Area (m²) | Roofing Cost per Piece (Ksh) | Total Material Pieces | Roofing Material Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Flooring & Slab
Flooring
| Number | Hardcore Volume (m³) | Hardcore Cost (Ksh) | Marram Volume (m³) | Marram Cost (Ksh) | DPC Amount (Rolls) | DPC Cost (Ksh) | BRC Mesh Amount (Rolls) | BRC Mesh Cost (Ksh) | Concrete Volume (m³) | Concrete Cost (Ksh) | Screed Mortar Volume (m³) | Mortar Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
Total Flooring Cost: KES 0.00
Slab
| Name | Length (m) | Width (m) | Thickness (m) | Volume (m³) | Concrete Cost per m³ (Ksh) | Concrete Cost (Ksh) | Formwork Area (m²) | Formwork Cost (Ksh) | Rebar Weight (kg) | Rebar Cost per kg (Ksh) | Rebar Cost (Ksh) | Steel Fabrication Cost (Ksh) | Total Slab Cost (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
Total Slab Cost: KES 0.00
KES 0.00
Staircase Construction
| Name | Type | Material | Number of Steps | Riser (mm) | Tread (mm) | Length (mm) | Width (mm) | Landing Area (mm²) | Concrete Volume (m³) | Concrete Unit Cost (Ksh) | Handrail Type | Handrail Cost (Ksh/m) | Handrail Length (mm) | Railing Material | Railing Cost (Ksh/m) | Railing Length (mm) | Formwork Area (mm²) | Formwork Unit Cost (Ksh) | Steel Weight (kg) | Steel Unit Cost (Ksh/kg) | Steel Fabrication Cost (Ksh) | Total Staircase Cost (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Total Civil Works: KES 0
Finishing Works
Floor Finishes
| Flooring Type | Quantity | Unit Price (Ksh) | Labor Units (reserved) | Cost per Labor Unit (Ksh) | Total Cost (Ksh) |
|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Doors and Windows
| # Windows | Window Type | Window Material | Window Unit Cost (Ksh) | Sill Cost (Ksh) | Glazing Type | Pelmet Cost (Ksh) | Fascia Cost (Ksh) | Bearers Cost (Ksh) | Curtain Track Cost (Ksh) | Total Windows Cost (Ksh) | # Doors | Door Type | Door Material | Door Unit Cost (Ksh) | Frame Cost (Ksh) | Varnish Cost (Ksh) | Timber Surface Cost (Ksh) | Hardware Cost (Ksh) | Total Doors Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Wall Finishes
| Wall Finish Type | Quantity | Unit Price (Ksh) | Total Cost (Ksh) |
|---|---|---|---|
| 0.00 |
KES 0.00
Countertop Finishes
| Countertop Finish Type | Quantity | Unit Price (Ksh) | Total Cost (Ksh) |
|---|---|---|---|
| 0.00 |
KES 0.00
Ceiling Finishes
| Ceiling Material | Quantity (Units) | Unit Cost (Ksh) | Total Cost (Ksh) |
|---|---|---|---|
| 0.00 |
KES 0.00
Exterior, Trim & Molding Finishes
| Exterior Finish Type | Exterior Quantity | Exterior Unit Price (Ksh) | Molding Type | Molding Quantity | Molding Unit Price (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Painting Costs
| Type of Painting | Paint Base | House Part | Paint Type | Quantity (Liters) | Unit Price (Ksh) | Total Cost (Ksh) |
|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Total Finishing Works: KES 0
Building Services
HVAC Systems
| HVAC Type | System Price (Ksh) | Installation Price (Ksh) | Total HVAC Cost (Ksh) |
|---|---|---|---|
| 0.00 |
KES 0.00
Drainage Systems
| System Type | Drainage Type | System Price (Ksh) | Installation Price (Ksh) | Total Drainage Cost (Ksh) |
|---|---|---|---|---|
| 0.00 |
KES 0.00
Water Distribution Systems
| Distribution System Type | Pipe Type | Pipe Length (m) | Pipe Cost per meter (Ksh) | Valves Cost (Ksh) | Fixtures Cost (Ksh) | Total Water Cost (Ksh) |
|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Gas Supply System
| Gas Type | Unit Price (Ksh) | Quantity (m³) | Installation Cost (Ksh) | Total Cost (Ksh) |
|---|---|---|---|---|
| 0.00 |
KES 0.00
Electrical & Lighting Systems
| Power Type | Unit Price (Ksh) | Power Capacity (kW) | Power Installation Cost (Ksh) | Power Wiring Type | Power Wire Length (m) | Power Wire Cost (Ksh/m) | Socket Quantity | Socket Price (Ksh) | Lighting Type | Lighting Unit Price (Ksh) | Lighting Quantity | Lighting Installation Cost (Ksh) | Lighting Wiring Type | Lighting Wire Length (m) | Lighting Wire Cost (Ksh/m) | Switch Quantity | Switch Price (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Total Building Services: KES 0
Labour & Professional Costs
General Labor
| Labor Type | Number of Workers | Daily Rate (KES) | Number of Days | Subtotal (KES) |
|---|---|---|---|---|
| Unskilled Labor | 0.00 | |||
| Semi-Skilled Labor | 0.00 | |||
| Skilled Labor | 0.00 |
Professional Services
| Professional Type | Hourly Rate (KES) | Number of Hours | Subtotal (KES) |
|---|---|---|---|
| Site Engineer | 0.00 | ||
| Quantity Surveyor | 0.00 | ||
| Project Manager | 0.00 | ||
| Architect | 0.00 |
Manually sum any labor costs from beams, columns, flooring, HVAC, etc. that are not already captured above.
Total Labour & Professional Cost: KES 0.00
Equipment Costs
| Equipment | Hourly Rate (Ksh) | Number of Operation Hours | Total Cost (Ksh) |
|---|---|---|---|
| 0.00 |
KES 0.00
Contingency Cost Estimation
| Optimistic Cost (Ksh) | Most Likely Cost (Ksh) | Pessimistic Cost (Ksh) | Estimated Contingency Cost (Ksh) |
|---|---|---|---|
| 0.00 |
Overhead Cost Estimation
| Overhead Cost Item | Cost (Ksh) |
|---|---|
KES 0.00
Total Construction Cost
Grand Total: KES 0.00
CostCraft Construction Estimate
Generated: 8/12/2026, 6:07:48 PM
Civil & Structural Works
Beams
| Name | Height (mm) | Width (mm) | Surface Area (m²) | Span (m) | Number | Volume (m³) | Concrete Unit Cost (Ksh/m³) | Steel Quantity (kg) | Steel Unit Cost (Ksh/kg) | Steel Links Qty (kg) | Steel Links Cost (Ksh) | Binding Wire Cost (Ksh) | Formwork Area (m²) | Formwork Unit Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Columns
| Name | Width (mm) | Depth (mm) | Area (m²) | Height (mm) | Number | Volume (m³) | Concrete Unit Cost (Ksh/m³) | Steel Quantity (kg) | Steel Unit Cost (Ksh/kg) | Steel Links Qty (kg) | Steel Links Cost (Ksh) | Binding Wire Qty (kg) | Binding Wire Cost (Ksh) | Formwork Area (m²) | Formwork Unit Cost (Ksh/m²) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Column Bases
| Name | Number | Length (mm) | Width (mm) | Thickness (mm) | Volume (m³) | Concrete Unit Cost (Ksh/m³) | Steel Qty (kg) | Steel Fab Cost (Ksh) | Steel Labor (Ksh) | Steel Overheads (Ksh) | Steel Unit Cost (Ksh/kg) | Binding Wire (Ksh) | Formwork Area (mm²) | Formwork Unit Cost (Ksh/m²) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Walls
| Name | Cost per Brick (Ksh) | Wall Length (m) | Wall Height (m) | Brick Length (mm) | Brick Height (mm) | Total Bricks | Brick Cost (Ksh) | Plastering Mortar Vol (m³) | Joint Mortar Vol (m³) | Mortar Volume (m³) | Mortar Cost per m³ (Ksh) | Total Mortar Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Foundations
| Foundation Type | Footing Thickness (mm) | Volume (m³) | Concrete Cost (Ksh) | Diameter of Footing Bars (mm) | Bottom Bars Length (m) | Top Bars Length (m) | Total Bars Length (m) | Reinforcement Weight (kg) | Total Bar Cost (Ksh) | Length of Foundation Wall (mm) | Width (mm) | Height (mm) | Cost of Bricks per Piece (Ksh) | Total Bricks | Brick Cost (Ksh) | Mortar Volume (m³) | Mortar Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Excavation
| Type | Length (mm) | Width (mm) | Depth (mm) | Total Excavation Volume (m³) | Excavation Cost per m³ (Ksh) | Row Cost (Ksh) |
|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Roof Works
| Roof Shape | Roof Material | House Length (mm) | House Width (mm) | Crosstie Length (mm) | Kingpost Height (mm) | Truss Cost per m (Ksh) | Total Truss Length (m) | Total Truss Cost (Ksh) | Purlin Spacing (mm) | Purlin Cost per m (Ksh) | Purlin Cost (Ksh) | Roofing Area Right (m²) | Roofing Area Left (m²) | Total Roof Area (m²) | Roofing Cost per Piece (Ksh) | Total Material Pieces | Roofing Material Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Flooring & Slab
Flooring
| Number | Hardcore Volume (m³) | Hardcore Cost (Ksh) | Marram Volume (m³) | Marram Cost (Ksh) | DPC Amount (Rolls) | DPC Cost (Ksh) | BRC Mesh Amount (Rolls) | BRC Mesh Cost (Ksh) | Concrete Volume (m³) | Concrete Cost (Ksh) | Screed Mortar Volume (m³) | Mortar Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
Total Flooring Cost: KES 0.00
Slab
| Name | Length (m) | Width (m) | Thickness (m) | Volume (m³) | Concrete Cost per m³ (Ksh) | Concrete Cost (Ksh) | Formwork Area (m²) | Formwork Cost (Ksh) | Rebar Weight (kg) | Rebar Cost per kg (Ksh) | Rebar Cost (Ksh) | Steel Fabrication Cost (Ksh) | Total Slab Cost (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
Total Slab Cost: KES 0.00
KES 0.00
Staircase Construction
| Name | Type | Material | Number of Steps | Riser (mm) | Tread (mm) | Length (mm) | Width (mm) | Landing Area (mm²) | Concrete Volume (m³) | Concrete Unit Cost (Ksh) | Handrail Type | Handrail Cost (Ksh/m) | Handrail Length (mm) | Railing Material | Railing Cost (Ksh/m) | Railing Length (mm) | Formwork Area (mm²) | Formwork Unit Cost (Ksh) | Steel Weight (kg) | Steel Unit Cost (Ksh/kg) | Steel Fabrication Cost (Ksh) | Total Staircase Cost (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Total Civil Works: KES 0
Finishing Works
Floor Finishes
| Flooring Type | Quantity | Unit Price (Ksh) | Labor Units (reserved) | Cost per Labor Unit (Ksh) | Total Cost (Ksh) |
|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Doors and Windows
| # Windows | Window Type | Window Material | Window Unit Cost (Ksh) | Sill Cost (Ksh) | Glazing Type | Pelmet Cost (Ksh) | Fascia Cost (Ksh) | Bearers Cost (Ksh) | Curtain Track Cost (Ksh) | Total Windows Cost (Ksh) | # Doors | Door Type | Door Material | Door Unit Cost (Ksh) | Frame Cost (Ksh) | Varnish Cost (Ksh) | Timber Surface Cost (Ksh) | Hardware Cost (Ksh) | Total Doors Cost (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Wall Finishes
| Wall Finish Type | Quantity | Unit Price (Ksh) | Total Cost (Ksh) |
|---|---|---|---|
| 0.00 |
KES 0.00
Countertop Finishes
| Countertop Finish Type | Quantity | Unit Price (Ksh) | Total Cost (Ksh) |
|---|---|---|---|
| 0.00 |
KES 0.00
Ceiling Finishes
| Ceiling Material | Quantity (Units) | Unit Cost (Ksh) | Total Cost (Ksh) |
|---|---|---|---|
| 0.00 |
KES 0.00
Exterior, Trim & Molding Finishes
| Exterior Finish Type | Exterior Quantity | Exterior Unit Price (Ksh) | Molding Type | Molding Quantity | Molding Unit Price (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Painting Costs
| Type of Painting | Paint Base | House Part | Paint Type | Quantity (Liters) | Unit Price (Ksh) | Total Cost (Ksh) |
|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Total Finishing Works: KES 0
Building Services
HVAC Systems
| HVAC Type | System Price (Ksh) | Installation Price (Ksh) | Total HVAC Cost (Ksh) |
|---|---|---|---|
| 0.00 |
KES 0.00
Drainage Systems
| System Type | Drainage Type | System Price (Ksh) | Installation Price (Ksh) | Total Drainage Cost (Ksh) |
|---|---|---|---|---|
| 0.00 |
KES 0.00
Water Distribution Systems
| Distribution System Type | Pipe Type | Pipe Length (m) | Pipe Cost per meter (Ksh) | Valves Cost (Ksh) | Fixtures Cost (Ksh) | Total Water Cost (Ksh) |
|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Gas Supply System
| Gas Type | Unit Price (Ksh) | Quantity (m³) | Installation Cost (Ksh) | Total Cost (Ksh) |
|---|---|---|---|---|
| 0.00 |
KES 0.00
Electrical & Lighting Systems
| Power Type | Unit Price (Ksh) | Power Capacity (kW) | Power Installation Cost (Ksh) | Power Wiring Type | Power Wire Length (m) | Power Wire Cost (Ksh/m) | Socket Quantity | Socket Price (Ksh) | Lighting Type | Lighting Unit Price (Ksh) | Lighting Quantity | Lighting Installation Cost (Ksh) | Lighting Wiring Type | Lighting Wire Length (m) | Lighting Wire Cost (Ksh/m) | Switch Quantity | Switch Price (Ksh) | Row Total (Ksh) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00 |
KES 0.00
Total Building Services: KES 0
Labour & Professional Costs
General Labor
| Labor Type | Number of Workers | Daily Rate (KES) | Number of Days | Subtotal (KES) |
|---|---|---|---|---|
| Unskilled Labor | 0.00 | |||
| Semi-Skilled Labor | 0.00 | |||
| Skilled Labor | 0.00 |
Professional Services
| Professional Type | Hourly Rate (KES) | Number of Hours | Subtotal (KES) |
|---|---|---|---|
| Site Engineer | 0.00 | ||
| Quantity Surveyor | 0.00 | ||
| Project Manager | 0.00 | ||
| Architect | 0.00 |
Manually sum any labor costs from beams, columns, flooring, HVAC, etc. that are not already captured above.
Total Labour & Professional Cost: KES 0.00
Equipment Costs
| Equipment | Hourly Rate (Ksh) | Number of Operation Hours | Total Cost (Ksh) |
|---|---|---|---|
| 0.00 |
KES 0.00
Contingency Cost Estimation
| Optimistic Cost (Ksh) | Most Likely Cost (Ksh) | Pessimistic Cost (Ksh) | Estimated Contingency Cost (Ksh) |
|---|---|---|---|
| 0.00 |
Overhead Cost Estimation
| Overhead Cost Item | Cost (Ksh) |
|---|---|
KES 0.00
| Civil Works: | KES 0 |
| Finishing Works: | KES 0 |
| Building Services: | KES 0 |
| Labour Costs: | KES 0 |
| Equipment Costs: | KES 0 |
| Contingency: | KES 0 |
| Overheads: | KES 0 |
| GRAND TOTAL: | KES 0 |
Generated by CostCraft - Construction Cost Estimator
