Cost Estimation

Civil & Structural Works

Beams

NameHeight (mm)Width (mm)Surface Area (m²)Span (m)NumberVolume (m³)Concrete Unit Cost (Ksh/m³)Steel Quantity (kg)Steel Unit Cost (Ksh/kg)Steel Links Qty (kg)Steel Links Cost (Ksh)Binding Wire Cost (Ksh)Formwork Area (m²)Formwork Unit Cost (Ksh)Row Total (Ksh)
0.00
KES 0.00

Columns

NameWidth (mm)Depth (mm)Area (m²)Height (mm)NumberVolume (m³)Concrete Unit Cost (Ksh/m³)Steel Quantity (kg)Steel Unit Cost (Ksh/kg)Steel Links Qty (kg)Steel Links Cost (Ksh)Binding Wire Qty (kg)Binding Wire Cost (Ksh)Formwork Area (m²)Formwork Unit Cost (Ksh/m²)Row Total (Ksh)
0.00
KES 0.00

Column Bases

NameNumberLength (mm)Width (mm)Thickness (mm)Volume (m³)Concrete Unit Cost (Ksh/m³)Steel Qty (kg)Steel Fab Cost (Ksh)Steel Labor (Ksh)Steel Overheads (Ksh)Steel Unit Cost (Ksh/kg)Binding Wire (Ksh)Formwork Area (mm²)Formwork Unit Cost (Ksh/m²)Row Total (Ksh)
0.00
KES 0.00

Walls

NameCost per Brick (Ksh)Wall Length (m)Wall Height (m)Brick Length (mm)Brick Height (mm)Total BricksBrick Cost (Ksh)Plastering Mortar Vol (m³)Joint Mortar Vol (m³)Mortar Volume (m³)Mortar Cost per m³ (Ksh)Total Mortar Cost (Ksh)Row Total (Ksh)
0.00
KES 0.00

Foundations

Foundation TypeFooting Thickness (mm)Volume (m³)Concrete Cost (Ksh)Diameter of Footing Bars (mm)Bottom Bars Length (m)Top Bars Length (m)Total Bars Length (m)Reinforcement Weight (kg)Total Bar Cost (Ksh)Length of Foundation Wall (mm)Width (mm)Height (mm)Cost of Bricks per Piece (Ksh)Total BricksBrick Cost (Ksh)Mortar Volume (m³)Mortar Cost (Ksh)Row Total (Ksh)
0.00
KES 0.00

Excavation

TypeLength (mm)Width (mm)Depth (mm)Total Excavation Volume (m³)Excavation Cost per m³ (Ksh)Row Cost (Ksh)
0.00
KES 0.00

Roof Works

Roof ShapeRoof MaterialHouse Length (mm)House Width (mm)Crosstie Length (mm)Kingpost Height (mm)Truss Cost per m (Ksh)Total Truss Length (m)Total Truss Cost (Ksh)Purlin Spacing (mm)Purlin Cost per m (Ksh)Purlin Cost (Ksh)Roofing Area Right (m²)Roofing Area Left (m²)Total Roof Area (m²)Roofing Cost per Piece (Ksh)Total Material PiecesRoofing Material Cost (Ksh)Row Total (Ksh)
0.00
KES 0.00

Flooring & Slab

Flooring

NumberHardcore Volume (m³)Hardcore Cost (Ksh)Marram Volume (m³)Marram Cost (Ksh)DPC Amount (Rolls)DPC Cost (Ksh)BRC Mesh Amount (Rolls)BRC Mesh Cost (Ksh)Concrete Volume (m³)Concrete Cost (Ksh)Screed Mortar Volume (m³)Mortar Cost (Ksh)Row Total (Ksh)
0.00
Total Flooring Cost: KES 0.00

Slab

NameLength (m)Width (m)Thickness (m)Volume (m³)Concrete Cost per m³ (Ksh)Concrete Cost (Ksh)Formwork Area (m²)Formwork Cost (Ksh)Rebar Weight (kg)Rebar Cost per kg (Ksh)Rebar Cost (Ksh)Steel Fabrication Cost (Ksh)Total Slab Cost (Ksh)
0.00
Total Slab Cost: KES 0.00
KES 0.00

Staircase Construction

NameTypeMaterialNumber of StepsRiser (mm)Tread (mm)Length (mm)Width (mm)Landing Area (mm²)Concrete Volume (m³)Concrete Unit Cost (Ksh)Handrail TypeHandrail Cost (Ksh/m)Handrail Length (mm)Railing MaterialRailing Cost (Ksh/m)Railing Length (mm)Formwork Area (mm²)Formwork Unit Cost (Ksh)Steel Weight (kg)Steel Unit Cost (Ksh/kg)Steel Fabrication Cost (Ksh)Total Staircase Cost (Ksh)
0.00
KES 0.00

Total Civil Works: KES 0

Finishing Works

Floor Finishes

Flooring TypeQuantityUnit Price (Ksh)Labor Units (reserved)Cost per Labor Unit (Ksh)Total Cost (Ksh)
0.00
KES 0.00

Doors and Windows

# WindowsWindow TypeWindow MaterialWindow Unit Cost (Ksh)Sill Cost (Ksh)Glazing TypePelmet Cost (Ksh)Fascia Cost (Ksh)Bearers Cost (Ksh)Curtain Track Cost (Ksh)Total Windows Cost (Ksh)# DoorsDoor TypeDoor MaterialDoor Unit Cost (Ksh)Frame Cost (Ksh)Varnish Cost (Ksh)Timber Surface Cost (Ksh)Hardware Cost (Ksh)Total Doors Cost (Ksh)Row Total (Ksh)
0.00
KES 0.00

Wall Finishes

Wall Finish TypeQuantityUnit Price (Ksh)Total Cost (Ksh)
0.00
KES 0.00

Countertop Finishes

Countertop Finish TypeQuantityUnit Price (Ksh)Total Cost (Ksh)
0.00
KES 0.00

Ceiling Finishes

Ceiling MaterialQuantity (Units)Unit Cost (Ksh)Total Cost (Ksh)
0.00
KES 0.00

Exterior, Trim & Molding Finishes

Exterior Finish TypeExterior QuantityExterior Unit Price (Ksh)Molding TypeMolding QuantityMolding Unit Price (Ksh)Row Total (Ksh)
0.00
KES 0.00

Painting Costs

Type of PaintingPaint BaseHouse PartPaint TypeQuantity (Liters)Unit Price (Ksh)Total Cost (Ksh)
0.00
KES 0.00

Total Finishing Works: KES 0

Building Services

HVAC Systems

HVAC TypeSystem Price (Ksh)Installation Price (Ksh)Total HVAC Cost (Ksh)
0.00
KES 0.00

Drainage Systems

System TypeDrainage TypeSystem Price (Ksh)Installation Price (Ksh)Total Drainage Cost (Ksh)
0.00
KES 0.00

Water Distribution Systems

Distribution System TypePipe TypePipe Length (m)Pipe Cost per meter (Ksh)Valves Cost (Ksh)Fixtures Cost (Ksh)Total Water Cost (Ksh)
0.00
KES 0.00

Gas Supply System

Gas TypeUnit Price (Ksh)Quantity (m³)Installation Cost (Ksh)Total Cost (Ksh)
0.00
KES 0.00

Electrical & Lighting Systems

Power TypeUnit Price (Ksh)Power Capacity (kW)Power Installation Cost (Ksh)Power Wiring TypePower Wire Length (m)Power Wire Cost (Ksh/m)Socket QuantitySocket Price (Ksh)Lighting TypeLighting Unit Price (Ksh)Lighting QuantityLighting Installation Cost (Ksh)Lighting Wiring TypeLighting Wire Length (m)Lighting Wire Cost (Ksh/m)Switch QuantitySwitch Price (Ksh)Row Total (Ksh)
0.00
KES 0.00

Total Building Services: KES 0

Labour & Professional Costs

General Labor

Labor TypeNumber of WorkersDaily Rate (KES)Number of DaysSubtotal (KES)
Unskilled Labor0.00
Semi-Skilled Labor0.00
Skilled Labor0.00

Professional Services

Professional TypeHourly Rate (KES)Number of HoursSubtotal (KES)
Site Engineer0.00
Quantity Surveyor0.00
Project Manager0.00
Architect0.00

Manually sum any labor costs from beams, columns, flooring, HVAC, etc. that are not already captured above.

Total Labour & Professional Cost: KES 0.00

Equipment Costs

EquipmentHourly Rate (Ksh)Number of Operation HoursTotal Cost (Ksh)
0.00
KES 0.00

Contingency Cost Estimation

Optimistic Cost (Ksh)Most Likely Cost (Ksh)Pessimistic Cost (Ksh)Estimated Contingency Cost (Ksh)
0.00

Overhead Cost Estimation

Overhead Cost ItemCost (Ksh)
KES 0.00

Total Construction Cost

Grand Total: KES 0.00